Construction + Operation & Maintenance

CWind Taiwan, a joint venture between CWind and IOVTEC construction and O&M services for the offshore wind industry in Taiwan. From CWind, CWind Taiwan has inherited experience working at over 50 European offshore wind farms and operates to the highest European standards of Health and Safety. With a range of integrated services and packages across the lifecycle of an offshore wind farm, CWind Taiwan delivers a full turnkey solution to provide regular maintenance and maximize the life of offshore asset for our customers.

A constant, efficient and safe power supply is critical to the smooth and uninterrupted construction and maintenance of a wind farm. Even in a harsh offshore condition, our professional technical team can still provide a complete package including messenger wire installation and cable pulling through to cable terminations and testing.
Our construction supports include:

  • Cable Pull-in
  • Temporary Power
  • Installation Support

Our professional technical team can provide customized integrated maintenance services for large-scale wind power assets and related equipment, such as wind turbines, cables, underwater foundation maintenance, etc. Through analysis of equipment parts, Sub-surface ROV surveys and system inspection, we collect relevant information and report to our customer in time and establish a complete maintenance plan for our customers.

Our operation & maintenance services include:

  • WTG Solution
  • Topside BOP
  • Subsea BOP

Global Marine Group, the parent company of CWind UK, has taken part in offshore wind market at early stage and was responsible for installing the inter array cables. Cable installation at an offshore wind farm development is a critically important phase. Our complete cable care service provides our customers with a single contracting entity, saving internal management fees, reduced risk, interface management and seamless execution of projects.

Our power cables services include:

  • Cable Trenching
  • Route Clearance
  • Pre-project Planning and Cable

Our Track Records

Time Requester Location Scope of Work
2020 Shimizu TPC Changhua OWF Phase 1 Temporary Power
2020 TPC TPC Changhua OWF Phase 1 Route Clearance
2019 WPD Liwei OWF Cable Depth of Burial
2019 Formosa 1 Wind Power Co F1 OWF Phase 2 Route Clearance
2022 Skyborn (WPD) Yunneng OWF Pile Installation Positionging
Time Requester Location Scope of Work
2020-2021 Formosa 1 Wind Power Co F1 OWF Phase 2 Topside Balance of Plant-Inspection, Maintenance and Repair
2020 Formosa 1 Wind Power Co F1 OWF Phase 2 Balance of Plant-Inspection, Maintenance and Repair
2022 Jan de Nul TPC Changhua OWF Phase 1 Paint Inspection & Repair
2022 CIP CFXD OWF Balance of Plant
2022 Ørsted Greater Changhua OWF Onshore Temporary Power Supply