A constant, efficient and safe power supply is critical to the smooth and uninterrupted construction and maintenance of a wind farm. Even in a harsh offshore condition, our professional technical team can still provide a complete package including messenger wire installation and cable pulling through to cable terminations and testing.
Our construction supports include:
- Cable Pull-in
- Temporary Power
- Installation Support
Our professional technical team can provide customized integrated maintenance services for large-scale wind power assets and related equipment, such as wind turbines, cables, underwater foundation maintenance, etc. Through analysis of equipment parts, Sub-surface ROV surveys and system inspection, we collect relevant information and report to our customer in time and establish a complete maintenance plan for our customers.
Our operation & maintenance services include:
- WTG Solution
- Topside BOP
- Subsea BOP
Global Marine Group, the parent company of CWind UK, has taken part in offshore wind market at early stage and was responsible for installing the inter array cables. Cable installation at an offshore wind farm development is a critically important phase. Our complete cable care service provides our customers with a single contracting entity, saving internal management fees, reduced risk, interface management and seamless execution of projects.
Our power cables services include:
- Cable Trenching
- Route Clearance
- Pre-project Planning and Cable
Our Track Records
Time | Requester | Location | Scope of Work |
---|---|---|---|
2020 | Shimizu | TPC Changhua OWF Phase 1 | Temporary Power |
2020 | TPC | TPC Changhua OWF Phase 1 | Route Clearance |
2019 | WPD | Liwei OWF | Cable Depth of Burial |
2019 | Formosa 1 Wind Power Co | F1 OWF Phase 2 | Route Clearance |
2022 | Skyborn (WPD) | Yunneng OWF | Pile Installation Positionging |
Time | Requester | Location | Scope of Work |
---|---|---|---|
2020-2021 | Formosa 1 Wind Power Co | F1 OWF Phase 2 | Topside Balance of Plant-Inspection, Maintenance and Repair |
2020 | Formosa 1 Wind Power Co | F1 OWF Phase 2 | Balance of Plant-Inspection, Maintenance and Repair |
2022 | Jan de Nul | TPC Changhua OWF Phase 1 | Paint Inspection & Repair |
2022 | CIP | CFXD OWF | Balance of Plant |
2022 | Ørsted | Greater Changhua OWF Onshore | Temporary Power Supply |